SS-EN-16907-3 Earthworks - Part 3: Construction procedures

SS-EN-16907-3 - 2018 EDITION - CURRENT


Document Center Inc. is an authorized dealer of SIS standards.
The following bibliographic material is provided to assist you with your purchasing decision:


This European Standard provides execution procedures for excavating, transporting and placing soils and rocks for the construction of earth-structures and guidance for the work. Additionally, it includes excavation and placement of rock materials underwater. Dredging of soils and the associated hydraulic placement of fills are covered by EN 16907-6 and EN 16907-7. Execution of earthworks follows the conclusions of the earthworks design and optimization phase (EN 16907-1), which should anticipate soil and rock specificities and their suitability. In case some events could not be foreseen, additional design is performed during the execution of works.

To find similar documents by classification:

93.020 (Earthworks. Excavations. Foundation construction. Underground works Including geotechnics Earth-moving machinery, see 53.100)

This document comes with our free Notification Service, good for the life of the document.

This document is available in either Paper or PDF format.

ORDER

Price:

$251.25        


Want this as a site license?



Designation Name

SS-EN 16907-3:2018

Revision Level

2018 EDITION

Status

Current

Publication Date

Dec. 12, 2018

Language(s)

English

Page Count

96

International Equivalent

EN 16907-3:2018(IDT)