SS-EN-1536 Execution of special geotechnical work - Bored piles

SS-EN-1536 - 2010/A1 EDITION - CURRENT
Show Complete Document History

Document Center Inc. is an authorized dealer of SIS standards.
The following bibliographic material is provided to assist you with your purchasing decision:


1.1 This European Standard establishes general principles for the execution of bored piles (see 3.2). NOTE 1 This standard covers piles or barrettes which are formed in the ground by excavation and are structural members used to transfer actions and/or limit deformations. NOTE 2 This standard covers piles with circular cross-section (see Figures 1 and A.1a)) and barrettes (see 3.3) with rectangular, T or L or any other similar cross-section (see Figure 2) concreted in a single operation. NOTE 3 In the standard the term pile is used for circular cross-section structure and the term barrette for other shapes. Both are bored piles. 1.2 This European Standard applies to bored piles (see Figure 3) with: - uniform cross-section (straight shaft); - telescopically changing shaft dimensions; - excavated base enlargements; or - excavated shaft enlargements. NOTE The shape of a pile base and of an enlargement depends on the tool used for the excavation. 1.3 This European Standard applies (see Note) to: - bored piles with a depth to width ratio ? 5; - piles (see Figures 1 and 3) with a shaft diameter 0,3 m ? D ? 3,0 m; - barrettes (see Figure 2) with the least dimension Wi ? 0,4 m, a ratio LBiB / Wi between its largest and its least dimensions ? 6 and a cross-sectional area A ? 15 m²; - piles with circular precast elements used as structural member (see Figure 7) with a least dimension DP ? 0,3 m; - barrettes with rectangular precast elements used as structural member with a least dimension WP ? 0,3 m. NOTE The standard covers a large range of diameters. For small diameter bored piles less than 450 mm, the general specification can be adapted to cater for the lack of space (e.g. minimum bars number and spacing). 1.4 This European Standard applies to piles with the following rake (see Figure 4): - n ? 4 (? ? 76°); - n ? 3 (? ? 72°) for permanently cased piles. (...)

To find similar documents by classification:

93.020 (Earthworks. Excavations. Foundation construction. Underground works Including geotechnics Earth-moving machinery, see 53.100)

This document comes with our free Notification Service, good for the life of the document.

This document is available in either Paper or PDF format.

ORDER

Price:

$251.25        


Want this as a site license?



Designation Name

SS-EN 1536:2010+A1:2015

Revision Level

2010/A1 EDITION

Status

Current

Publication Date

June 14, 2015

Language(s)

English

Page Count

92

International Equivalent

EN 1536:2010+A1:2015(IDT)