IEC-61557-7 Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC - Equipment for testing, measuring or monitoring of protective measures - Part 7: Phase sequence

IEC-61557-7 - EDITION 3.1 - CURRENT
Show Complete Document History

Document Center Inc. is an authorized dealer of IEC standards.
The following bibliographic material is provided to assist you with your purchasing decision:

Included in this current edition are the following subparts:

 EDITION 3.1 - Aug. 1, 2023
 FOR ED. 3.0 AMENDMENT 1 SEE - Aug. 1, 2023

IEC 61557-7:2019+AMD1:2023 specifies the requirements applicable to measuring equipment for testing the phase sequence in three-phase distribution systems. Indication of the phase sequence can be mechanical, visual and/or audible. This document does not apply to additional measurements for other quantities. It does not apply to monitoring relays. IEC 61557-7:2019 cancels and replaces the second edition published in 2007. This edition constitutes a technical revision. This edition includes the following changes with respect to the previous edition:
a) alignment of the structure with that of the whole IEC 61557 series;
b) updated requirements in 4.3 in accordance with new editions of IEC 61010-1 and IEC 61010-031;
c) the information on markings was extended;
d) the information on the operating instructions was extended;
e) complement to the information on the testing of leads;
f) test leads for insulated conductors were introduced;
g) Annex B was added with information on phase sequence tests and indications.
ORDER

Price:

$161.99        


Want this as a site license?

Document Number

IEC 61557-7 Ed. 3.1 b:2023

Revision Level

EDITION 3.1

Status

Current

Publication Date

Aug. 1, 2023

Committee Number

85