ASTM-F1947 › Standard Practice for Installation of Folded Poly (Vinyl Chloride) (PVC) Pipe into Existing Sewers and Conduits
The following bibliographic material is provided to assist you with your purchasing decision:
Scope
1.1 This practice describes the procedures for the rehabilitation of sewer lines and conduits (4 to 15 in. diameter) by the insertion of a folded PVC pipe, which is heated, pressurized, and expanded against the interior surface of an existing pipe with either a mechanical rounding device or steam pressure. The finished PVC pipe will be continuous and conform to the existing conduit. This rehabilitation process can be used in a variety of gravity applications, such as sanitary sewers, storm sewers and process piping.
1.2 The values stated in inch-pound units are to be regarded as the standard. The values given in parentheses are provided for information purposes only.
1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
Keywords
installation-underground; plastic pipe-thermoplastic; poly (vinyl chloride) PVC plastic pipe; rehabilitation; ICS Number Code 23.040.20 (Plastic pipes); 83.080.20 (Thermoplastic materials)
To find similar documents by ASTM Volume:
08.04 (Plastic Piping Systems)
To find similar documents by classification:
83.080.20 (Thermoplastic materials)
This document comes with our free Notification Service, good for the life of the document.
This document is available in either Paper or PDF format.
Document Number
ASTM-F1947-21A
Revision Level
2021A EDITION
Status
Current
Modification Type
New
Publication Date
Aug. 27, 2021
Document Type
Practice
Page Count
6 pages
Committee Number
F17.67