ASTM-E2013 › Standard Practice for Developing Functions, Constructing FAST Diagrams, and Performing Function Analysis During Value Engineering (VE)/Value Analysis (VA) Study
The following bibliographic material is provided to assist you with your purchasing decision:
Scope
1.1 This practice covers a logical structure for the function analysis of a project, product, or process.
1.2 This practice provides a system to identify, define, and clearly communicate the purpose of a project, product, or process and the associated elements of the project, product, or process.
1.3 This practice covers the relationship between the functions that must be satisfied and the resources for a project, product, or process to accomplish those functions.
1.4 The values stated in SI units are to be regarded as standard. The values given in parentheses after SI units are provided for information only and are not considered standard.
1.5 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.
1.6 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.
Significance and Use
5.1 As part of the VE/VA study, perform function analysis after the collection of relevant information and prior to the identification of alternatives.
5.2 This practice provides a specific understanding of what must be accomplished and provides the basis for stimulating the creative phase of the value methodology. This is accomplished by naming and analyzing the functions and using the functions of the VE/VA study to generate ideas and alternative solutions.
5.3 This practice establishes a communication format through which all stakeholders can understand the project, product, or process.
5.4 This practice presents a method by which stakeholders’ needs and desires are compared to the cost to satisfy those needs and desires.
5.4.1 Function cost data help the user identify the alternatives and their functions that are highly valued with respect to their cost, thereby targeting opportunities for increasing value.
5.4.2 Targeting is done by identifying the low preference/high cost functions and high preference/low cost functions. These data will be used in the VE/VA study as a basis to create alternative solutions.
5.5 This practice helps stakeholders to formulate a strategy to maximize values.
5.6 Functions are also used to define criteria to compare alternatives.
Keywords
building economics; cost efficiency; cost/preference combinations; function analysis; function analysis system technique (FAST); project planning; return on investment; risk analysis; UNIFORMAT II; value engineering;
To find similar documents by ASTM Volume:
04.11 (Building Constructions (I): E72 - E2110)
To find similar documents by classification:
This document comes with our free Notification Service, good for the life of the document.
This document is available in either Paper or PDF format.
Customers who bought this document also bought:
ASTM-E1699Standard Practice for Performing Value Engineering (VE)/Value Analysis (VA) of Projects, Products and Processes
Document Number
ASTM-E2013-20
Revision Level
2020 EDITION
Status
Current
Modification Type
Revision with Title Change
Publication Date
Dec. 29, 2020
Document Type
Practice
Page Count
10 pages
Committee Number
E06.81