ISO-7870-3 › Historical Revision Information
Control charts - Part 3: Acceptance control charts
The following bibliographic material is provided to assist you with your purchasing decision:
ISO 7870-3:2012 gives guidance on the uses of acceptance control charts and establishes general procedures for determining sample sizes, action limits and decision criteria. This chart should be used only when: a) the within subgroup variation is in-control and the variation is estimated efficiently; b) a high level of process capability has been achieved.
This chart is typically used when the process variable under study is normally distributed, however, it can be applied to a non-normal distribution. Examples are included to illustrate a variety of circumstances in which this technique has advantages and to provide details of the determination of the sample size, the action limits and the decision criteria.
Abstract
ISO 7870-3:2012 gives guidance on the uses of acceptance control charts and establishes general procedures for determining sample sizes, action limits and decision criteria. This chart should be used only when: a) the within subgroup variation is in-control and the variation is estimated efficiently; b) a high level of process capability has been achieved.
This chart is typically used when the process variable under study is normally distributed, however, it can be applied to a non-normal distribution. Examples are included to illustrate a variety of circumstances in which this technique has advantages and to provide details of the determination of the sample size, the action limits and the decision criteria.
To find similar documents by classification:
03.120.30 (Application of statistical methods)
This document comes with our free Notification Service, good for the life of the document.
This document is available in either Paper or PDF format.
Document Number
ISO 7870-3:2012
Revision Level
1ST EDITION
Status
Superseded
Publication Date
March 1, 2012
Committee Number
ISO/TC 69/SC 4