ISO-4917-6 › Design of nuclear power plants against seismic events - Part 6: Post-seismic measures
The following bibliographic material is provided to assist you with your purchasing decision:
This document applies to nuclear power plants with water cooled reactors.
This document does not apply to earthquakes stronger than the design basis earthquake.
This document specifies guidance on the actions to be taken in preparation for and following an earthquake at a nuclear power plant. This document is intended to be used as a guideline for decision making regarding continued operation, shutdown and restart of the nuclear power plant after an earthquake. It can also be used to assist operating organizations in the preparation and implementation of an overall pre- and post-earthquake action programme for dealing with situations in accordance with the level of seismic ground motion experienced at the site, and the seismic design level of the plant.
To find similar documents by classification:
27.120.20 (Nuclear power plants. Safety Radiation protection, see 13.280)
91.120.25 (Seismic and vibration protection Vibrations and vibration measurements, see 17.160)
This document comes with our free Notification Service, good for the life of the document.
This document is available in either Paper or PDF format.
Document Number
ISO 4917-6:2024
Revision Level
1ST EDITION
Status
Current
Publication Date
Feb. 1, 2024
Committee Number
ISO/TC 85/SC 6